Short construction and green building for steel structure

Short construction and green building for steel structure

1. Short construction and installation period

Beams, columns, wallboards and roofs are all installed in an assembly way. Only cast-in-place reinforced concrete is needed in the floor slab, and the construction speed is fast.

Compared with the traditional houses that can be built in a year and a half, the construction period can be shortened by more than 2 / 3! 300 square meters of house, 5 workers a month easy to handle!

steel frame stairs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. Energy saving and emission reduction belong to green building

The wall adopts light energy-saving standardized prefabricated wallboard instead of clay brick, with less use of sand, stone, cement and water, more than 80% of the materials can be recycled,

saving energy and protecting the environment, especially in the construction site, with lower pollution.

steel structure house

 


Post time: Mar-20-2020

WhatsApp Online Chat !